We in the face of this emergency, usually take the following two methods to fire power, the effect has been reached.
(1) The processing power of technology: To prevent electric shock at the scene, so we know when power is first of all have to cooperate electrotechnical personnel for the job, then it should have a professional power equipment cut off the power when it should take these types of technical measures: Use 跃落 fuse cut off power supply; substation off the main switch; the request of local transformer power supply bureau where power outages.
(2) off after fighting measures: When the transformer fire, fighting off the power after the method is substantially the same. If the fuel tank ruptured, and a large number of oil outflow and combustion, we should immediately cut off the power immediately after the spray water or foam to fight the blaze, if conditions allow, can also be buried beneath the sand, if the fire was too fierce, we Trenching will focus on the use of oil with foam to fight the blaze; if the tank is not damaged by dry powder fire extinguishing agent can be; and we need to know a large substation equipment, it has a lot of attitude quality insulating sleeve, these sleeves in In case of high temperature quenching or cooling when uneven, easy to burst, severe cases can damage the equipment, which will result in unnecessary losses; if the casing burst after the insulating oil will result in the insulating oil dispersed, so that the fire further expansion spread, so, in which case the best use of water spray fire, and pay attention to uniform cooling equipment.